I found this description of a 'typical' supercharger setup:
"The eight bay setup takes a 12kV, 750kVA feed from the utility, steps it down to 480V three phase on site, pushes that into 2000A switchgear which feeds four (one for each pair of bays) SuperCharger units at 480V/200A."